ABSTRACT
Stadium crowd referred to the number of people corning together in cluster for sporting activities and other events in the stadium. The stadium crowd is usually associated with certain problems that include but not limited to problems of movement, ventilation, temperature, and crime, whereas this research is limited to the problem of circulation. The researcher reviewed past studies in which FIFA guide/recommendations and other similar areas of interest were made useful. The study aimed at providing football stadium that can allow safer crowd environment for sustainable spectatorship. A survey research was adopted. The study population comprised of 25 management staff, 20 technical staff, 20 security staff including police men, 1049 spectators for both the Uyo and Abuja stadia. The study utilised purposive sampling of the non-probability sampling technique. Questionnaire was used as the research instrument, in which 485 number was administered at the Uyo stadium, while 660 was administered at the Abuja stadium. A total of 1114 was possibly retrieved out of 1145. The researcher used research assistant to collect some of the data, and the entire data was then coded and organised for analysis using SPSS and Excel software, and were summarised in tables and charts for easy interpretations. The result indicated that the crowd management strategies used in most stadia were adequate except at the situation of full capacity evacuation. The result is shown in percentage for adequate, fair and inadequate scores for CCTV (17%, 15%, 9%), stadium entrance (86.9%, 7.3%, 5.8%), lighting (13%, 85%, 2%), signage (8.5%, 84.4%, 7.1%), peak period evacuation (18.6%, 7.6%, 73.8%), ticketing (11.9%, 74.6%, 13.5%), seating plan (48.4%, 40.1%, 11.5%), security personnel posting (42.2%, 40.3%, 17.5%), queuing and assembly of fans (64.4%, 35.6%, 0%), gate opening (77.6%, 13.6%, 8.8%). In conclusion, the evacuation at peak periods at stadia is usually inadequate. The concept of the research solution was made in three main ways; Improvement on the ingress/egress system, open circulation from upper levels of the sitting bowl to allow for easy evacuation, improving the emergency/vehicular access ways as improvement ofthe full capacity evacuation. and also awareness programs on the proper use of stadium facilities should be provided to all visitors as key recommendations of this research.
CHAPTER ONE
1.0 INTRODUCTION
1.1 Background to the Study
Football has become one of the most popular if not the most popular sporting game commonly played and watched by enormous number of people all around the world. The evidence of this is noticed in all comers of villages, towns and cities of the world. Stadium arenas were considered amongst the largely populated areas within a community leading to crowd generation (Liu et al., 2011).
Crowd could be seen according to Powell (1994) as group or number of people attending a common gathering such as that ofpolitics, sport, and public events. Crowding is created by strong involvement in human agitation especially the crowd experienced at event grounds (Price, 2003). The crowd caused by population in a football stadium usually results to instabilities in pedestrian movement (Powell, 1994). One significant part of making sure that there is safer crowd at venues is by designing proper systems of circulation which can enable effective and strategic evacuation (Liu et al., 2011).
Niger state been one of the states of the federation of Nigeria, is among the states that was blessed with large number of state income generating potentials like market business opportunities, tourism, agriculture and education. However, when we look at the movement of sports, football is another concern that gain popularity with huge number of players from different parts of the state playing on a typical grounds and fields. According to a report by Unaeze (2018), the present Niger state government proposes the construction of International Stadium at Maikunkele Niger State to cover for the old Bako Kontagora stadium that is 5000 in capacity, which cannot support the increasing user population, as it results in low effective pedestrian circulation especially when 1 people move, sit, exiting and on general use of the stadium. This is the main reason for the conduction of this research work.
At the end of this research work, a new modem stadium will be planned and designed which shall adopt necessary modem stadium planning and design approaches where necessary, and also try to incorporate and blend multiple space management that will enhance crowd control in the new Niger State National Stadium.
1.2 Statement of the Research Problem
The Niger state football stadium named as the Bako Muhammed Kontagora stadium in Minna was closed down for lack of upgrade and functioning for about two football seasons, now gained simple rehabilitation for continuation of usual football matches. Unaeze (2018) also reported that following the near completion ofthe rehabilitation work on Bako Muhammed Kontagora stadium in Minna, the Niger State Sport Council has written to the League Management Company (LMC) to come and inspect the stadium. The outcome of the report was that the work was good but the stadium cannot support the increasing crowd and that results to ineffective circulation management during top matches or events. It is from these two main reasons that this research work was carried out to solve the stated problem through an entirely new design consideration.
1.3 Aim and Objectives
Aim
The aim ofthis research is to provide strategies that could help in improving the state of crowd generated in the stadium especially at peak period.
Objectives
The following are provided as considerable objectives for use by this research work:
2
1. To use the local technical approaches for football stadium construction to create a design of a circulation effective stadium for Niger State
11. To create effective access ways and concourse circulation for enhancing
movement within the stadium.
1.4 Research Questions
These questions are used by the author in carrying out the research work, and the questions are asked by him.
1. What crowd control strategies can be adequately adopted for the stadium design?
11. How could the crowd control strategies be adequately used during planning od the stadium?
111. How could the relationship between the indoor and outdoor spaces of the entire stadium structure relate to help in controlling crowd at the stadium?
IV. How effective are the spaces to the users coming to visit the stadium?
v. In what ways can the existing stadium crowd be improved through new design approach?
1.5 Assumptions of the Study
The basic assumption proceeded by this research work is that stadia that are used in most part ofthe country especially in north, are those designed below FIFA standard because of lack of the following:
1. Adequate incorporation of circulation spaces that will enable crowd control
3
11 . Considerations for future expectations related to size of population and its associated problems
1.6 Scope of the Study
Areas where the content scope of this research work will cover includes the following functions:
1. Local International Olympic stadia of 60 thousand plus capacity
11. Local National and Inter-state stadia of 30- 40 thousand capacity
111. Foreign Olympic stadia 90 thousand plus capacity
iv. Foreign football stadia of 45 thousand plus capacity
v. Historical stadia. Berlin and Deutsches
1.7 Justification for the Study
Just as earlier stated by Faces International Magazine website 2018, that the state government had made proposal to carry out a new stadium project work that would support the increasing population as well as the future target (large capacity of people). Therefore, whenever there is population in large number especially in this type of gathering, there is always creation of crowd menace, which requires proper considerations in such a place.
This is the main reason that brought to justice the carrying out of this research work in the vain that how can the research be able to develop design which supports the large population as well as addressing the problem of crowd associated with the size of population expected.
This material content is developed to serve as a GUIDE for students to conduct academic research
ASSESSMENT OF CROWD CONTROL STRA TEGIES IN THE DESIGN OF NATIONAL STADIUM AT MINNA, NIGER STATE, NIGERIA>
Project 4Topics Support Team Are Always (24/7) Online To Help You With Your Project
Chat Us on WhatsApp » 09132600555
DO YOU NEED CLARIFICATION? CALL OUR HELP DESK:
09132600555 (Country Code: +234)
YOU CAN REACH OUR SUPPORT TEAM VIA MAIL: [email protected]
09132600555 (Country Code: +234)